Warwick Well Plant

Warwick, NY

PROJECT SUMMARY

Franchise was able to coordinate with engineers from the local municipalities to install the PI & D equipment, instrumentation panel and micro filtration modules needed to complete this system in its entirety. This water filtration plant serves the town of Warwick 400,000 gallons of water per day. Deep excavation was required for the installation of both vertical turbine clear well pumps as well as the fifty foot turbine pumps needed to complete this intricate system.

Featured Projects